⚡ Work Message Generator

ALAMINOS BESS | GigaAce4

Operations messaging, live unit state, analytics, planning, availability, and logs for SP1 / SP2.

--:--:--
--
Loading live plant status…
SP1 LIVE STATUS
No finalized state
Setpoint: —
Confirmed
SoC—
Entered State—
Running—
Last Update—
Availability—
SP2 LIVE STATUS
No finalized state
Setpoint: —
Confirmed
SoC—
Entered State—
Running—
Last Update—
Availability—

SoC Projection & Time to Target

Planning estimate using current/target SoC, usable energy capacity, one-way efficiency, and MW. Use the live-unit buttons to load the latest recorded SoC and active setpoint.

1 interval = 5 minutes
Direction—
Battery Energy to Target—
Estimated Time to Target—
Estimated Target Time—
Projected SoC after Intervals—
Enter usable capacity and SoC values to calculate. This is a planning estimate; actual SoC response can vary with BMS limits, auxiliary load, temperature, losses, and control behavior.

Plant Availability / Derating

Append-only status history for SP1 and SP2. Log Available, Derated, or Unavailable states with rated/available MW and reason. A later Available record closes the previous limitation operationally without deleting history.

SP1No record
Availability —
Log the first availability record below.
SP2No record
Availability —
Log the first availability record below.

Equipment Availability

Select multiple PCS/ESS units and log a shared availability status in one action. SP1 uses 1–12; SP2 uses 13–24. Rollups use Site Settings.

SP1 • No equipment recordsPCS 1–12 • ESS 1–12
SP2 • No equipment recordsPCS 13–24 • ESS 13–24
0 selected • select any PCS / ESS combination
AvailableDeratedUnavailableNo explicit record

Analytics

Longer-term operational insight from active logs and availability records. Deleted and superseded records are excluded automatically.

Charged Energy0.00 MWh00:00 charging
Discharged Energy0.00 MWh00:00 discharging
Energy Runtime00:00Net grid energy: 0.00 MWh
Weighted Availability—No availability data

Mode Utilization

Exclusive tracked time by operating state.

Availability / Derating

Time-weighted available MW versus rated MW.

MW / SoC Timeline

Logged operation setpoint and SoC measurements across the selected period.
SP1SP2

Operational Timeline

Chronological state and setpoint changes for SP1 / SP2. Select an event to open the Operations Log.
Analytics for today.

Site Settings

One source of truth for SP ratings, usable energy, SoC limits, efficiency, interval duration, shift schedule, and on-duty PCE.

SP1 • PCS/ESS 1–12

SP2 • PCS/ESS 13–24

GY can cross midnight automatically.
On-Duty PCESet the PCE assigned to each shift. SO remains contextual only when there is an instruction, acknowledgement, or informed status.

AM Shift

PM Shift

GY Shift

Settings are stored locally and synced to Supabase when configured.

Daily / Shift Statistics

Calculated from active operation logs. Charging and discharging energy account for setpoint changes within the selected period.

Logged Events0Active audit records
Charging Time00:000.00 MWh charged
Discharging Time00:000.00 MWh discharged
GCM RR Entries0Switches into GCM RR
GCM CR Entries0Switches into GCM CR
Simultaneous Events0Energy RTD + Reserve
Corrections0Active corrected records
Requests0Reference requests logged
Daily statistics for today.

Operation details

Enter the field data. The message updates automatically as you type.

GCM RR GCM CR Charging / Discharging
Output is converted to 24-hour format, e.g. 21:45 → 2145H.
Use only when the SO gave an instruction, was informed, or acknowledged an action. The on-duty PCE is recorded separately from Site Settings.
Charging is automatically shown as negative MW; discharging as positive MW.
Check before finalizing

    Shift Notes

    Informal notes for this browser. Separate from the formal Operations Log and not included in exports.

    Current Shift Switching SummaryUsing the shift schedule from Site Settings.
    No switching events in the current shift.
    Saved locally
    Copied