ALAMINOS BESS GigaAce4
SP1 / SP2 operations control, analytics, planning, availability, and audit records.
SoC Projection & Time to Target
Planning estimate using manually entered current/target SoC, usable energy capacity, one-way efficiency, and MW.
Plant Availability / Derating
Append-only status history for SP1 and SP2. Log Available, Derated, or Unavailable states with rated/available MW and reason. A later Available record closes the previous limitation operationally without deleting history.
Equipment Availability
PCS and ESS are displayed as operating pairs while remaining independently selectable. SP1 pairs 1–12; SP2 pairs 13–24. Every status change remains append-only in Equipment History.
Equipment History
History is collapsed • open when needed
Analytics
Longer-term operational insight from active logs and availability records. Deleted and superseded records are excluded automatically.
Mode Utilization
Exclusive tracked time by operating state.Availability / Derating
Time-weighted available MW versus rated MW.MW / SoC Timeline
Logged operation setpoint and SoC measurements across the selected period.Operational Timeline
Chronological state and setpoint changes for SP1 / SP2. Select an event to open the Operations Log.Site Settings
Configure SP ratings, usable energy, efficiency, interval duration, and the AM/PM/GY shift schedule.
SP1 • PCS/ESS 1–12
SP2 • PCS/ESS 13–24
Daily / Shift Statistics
Calculated from active operation logs. Charging and discharging energy account for setpoint changes within the selected period.
Equipment Availability
Current PCS / ESS condition from the latest equipment records.
ASPA Assignment
ASPA is shown together with the actual operating mode. SP2 is the primary contract unit; SP1 may operate as replacement for SP2 when required.
Operation details
Enter the field data. The message updates automatically as you type.
Shift Notes
Shared live notes for the current AM / PM / GY shift. Saved online through Supabase with a local fallback and revision history.