⚡ Work Message Generator

ALAMINOS BESS | GigaAce4

Operations messaging, live unit state, analytics, planning, availability, and logs for SP1 / SP2.

--:--:--
--
Loading live plant status…
SP1 LIVE STATUS
No finalized state
Setpoint: —
Confirmed
SoC—
Entered State—
Running—
Last Update—
Availability—
SP2 LIVE STATUS
No finalized state
Setpoint: —
Confirmed
SoC—
Entered State—
Running—
Last Update—
Availability—

SoC Projection & Time to Target

Planning estimate using manually entered current/target SoC, usable energy capacity, one-way efficiency, and MW.

1 interval = 5 minutes
Direction—
Battery Energy to Target—
Estimated Time to Target—
Estimated Target Time—
Projected SoC after Intervals—
Enter usable capacity and SoC values to calculate. This is a planning estimate; actual SoC response can vary with BMS limits, auxiliary load, temperature, losses, and control behavior.

Plant Availability / Derating

Append-only status history for SP1 and SP2. Log Available, Derated, or Unavailable states with rated/available MW and reason. A later Available record closes the previous limitation operationally without deleting history.

SP1No record
Availability —
Log the first availability record below.
SP2No record
Availability —
Log the first availability record below.

Equipment Availability

Select multiple PCS/ESS units and log a shared availability status in one action. SP1 uses 1–12; SP2 uses 13–24. Rollups use Site Settings.

SP1 • No equipment recordsPCS 1–12 • ESS 1–12
SP2 • No equipment recordsPCS 13–24 • ESS 13–24
0 selected • select any PCS / ESS combination
AvailableDeratedUnavailableNo explicit record

Analytics

Longer-term operational insight from active logs and availability records. Deleted and superseded records are excluded automatically.

Charged Energy0.00 MWh00:00 charging
Discharged Energy0.00 MWh00:00 discharging
Energy Runtime00:00Net grid energy: 0.00 MWh
Weighted Availability—No availability data

Mode Utilization

Exclusive tracked time by operating state.

Availability / Derating

Time-weighted available MW versus rated MW.

MW / SoC Timeline

Logged operation setpoint and SoC measurements across the selected period.
SP1SP2

Operational Timeline

Chronological state and setpoint changes for SP1 / SP2. Select an event to open the Operations Log.
Analytics for today.

Site Settings

Configure SP ratings, usable energy, efficiency, interval duration, and the AM/PM/GY shift schedule.

SP1 • PCS/ESS 1–12

SP2 • PCS/ESS 13–24

GY can cross midnight automatically.
Settings are stored locally and synced to Supabase when configured.

Daily / Shift Statistics

Calculated from active operation logs. Charging and discharging energy account for setpoint changes within the selected period.

Logged Events0Active audit records
Charging Time00:000.00 MWh charged
Discharging Time00:000.00 MWh discharged
GCM RR Entries0Switches into GCM RR
GCM CR Entries0Switches into GCM CR
Simultaneous Events0Energy RTD + Reserve
Corrections0Active corrected records
Requests0Reference requests logged
Daily statistics for today.

Operation details

Enter the field data. The message updates automatically as you type.

GCM RR GCM CR Charging / Discharging
Output is converted to 24-hour format, e.g. 21:45 → 2145H.
Use only when the SO gave an instruction, was informed, or acknowledged an action.
Charging is automatically shown as negative MW; discharging as positive MW.
Check before finalizing

    Shift Notes

    Shared live notes for the current AM / PM / GY shift. Saved online through Supabase with a local fallback and revision history.

    Daily Switching SummaryCalendar-day summary • 0000H–2359H.
    No switching events logged for this date.
    Current shiftOnline note not loaded yet.
    Loading shared note…
    Shift Note Revision History
    No revisions loaded.
    Copied