LIVE OPERATIONS

ALAMINOS BESS GigaAce4

SP1 / SP2 operations control, analytics, planning, availability, and audit records.

--:--:--
--
Loading live plant status…
SP1 LIVE STATUS
No finalized state
Setpoint: —
ASPANormal
Confirmed
SoC—
Running—
Availability—
EquipmentPCS — • ESS —
Entered State—
Last Update—
No active equipment limitations
SP2 LIVE STATUS
No finalized state
Setpoint: —
ASPAASPA Primary
Confirmed
SoC—
Running—
Availability—
EquipmentPCS — • ESS —
Entered State—
Last Update—
No active equipment limitations

SoC Projection & Time to Target

Planning estimate using manually entered current/target SoC, usable energy capacity, one-way efficiency, and MW.

1 interval = 5 minutes
Direction—
Battery Energy to Target—
Estimated Time to Target—
Estimated Target Time—
Projected SoC after Intervals—
Enter usable capacity and SoC values to calculate. This is a planning estimate; actual SoC response can vary with BMS limits, auxiliary load, temperature, losses, and control behavior.

Plant Availability / Derating

Append-only status history for SP1 and SP2. Log Available, Derated, or Unavailable states with rated/available MW and reason. A later Available record closes the previous limitation operationally without deleting history.

SP1No record
Availability —
Log the first availability record below.
SP2No record
Availability —
Log the first availability record below.

Equipment Availability

PCS and ESS are displayed as operating pairs while remaining independently selectable. SP1 pairs 1–12; SP2 pairs 13–24. Every status change remains append-only in Equipment History.

SP1 • No equipment limitationsPCS / ESS 1–12
PCS Available12 / 12
ESS Available12 / 12
Pairs Limited0
Available Capacity—
Unrecorded equipment is assumed Available.
SP2 • No equipment limitationsPCS / ESS 13–24
PCS Available12 / 12
ESS Available12 / 12
Pairs Limited0
Available Capacity—
Unrecorded equipment is assumed Available.
0 selected • select any PCS / ESS combination
AvailableDeratedUnavailableNo explicit record

Equipment History

History is collapsed • open when needed

Analytics

Longer-term operational insight from active logs and availability records. Deleted and superseded records are excluded automatically.

Charged Energy0.00 MWh00:00 charging
Discharged Energy0.00 MWh00:00 discharging
Energy Runtime00:00Net grid energy: 0.00 MWh
Weighted Availability—No availability data

Mode Utilization

Exclusive tracked time by operating state.

Availability / Derating

Time-weighted available MW versus rated MW.

MW / SoC Timeline

Logged operation setpoint and SoC measurements across the selected period.
SP1SP2

Operational Timeline

Chronological state and setpoint changes for SP1 / SP2. Select an event to open the Operations Log.
Analytics for today.

Site Settings

Configure SP ratings, usable energy, efficiency, and the AM/PM/GY shift schedule.

SP1 • PCS/ESS 1–12

SP2 • PCS/ESS 13–24

Settings are stored locally and synced to Supabase when configured.

Daily / Shift Statistics

Calculated from active operation logs. Charging and discharging energy account for setpoint changes within the selected period.

Logged Events0Active audit records
Charging Time00:000.00 MWh charged
Discharging Time00:000.00 MWh discharged
GCM RR Entries0Switches into GCM RR
GCM CR Entries0Switches into GCM CR
Simultaneous Events0Energy RTD + Reserve
Corrections0Active corrected records
Requests0Reference requests logged

Equipment Availability

Current PCS / ESS condition from the latest equipment records.

SP10 pairs limited
PCS 12/12 • ESS 12/12
No active equipment limitations
SP20 pairs limited
PCS 12/12 • ESS 12/12
No active equipment limitations

ASPA Assignment

ASPA is shown together with the actual operating mode. SP2 is the primary contract unit; SP1 may operate as replacement for SP2 when required.

SP1Flexible / replacement unit
Normal
No ASPA replacement assignment.
SP2ASPA contract unit
ASPA Primary
Primary ASPA assignment.
Daily statistics for today.

Operation details

Enter the field data. The message updates automatically as you type.

GCM RR GCM CR Charging / Discharging
Output is converted to 24-hour format, e.g. 21:45 → 2145H.
Use only when the SO gave an instruction, was informed, or acknowledged an action.
Charging is automatically shown as negative MW; discharging as positive MW.
Check before finalizing

    Shift Notes

    Shared live notes for the current AM / PM / GY shift. Saved online through Supabase with a local fallback and revision history.

    Daily Switching SummaryCalendar-day summary • 0000H–2359H.
    No switching events logged for this date.
    Current shiftOnline note not loaded yet.
    Loading shared note…
    Shift Note Revision History
    No revisions loaded.
    Copied