ALAMINOS BESS | GigaAce4
Operations messaging, live unit state, analytics, planning, availability, and logs for SP1 / SP2.
SoC Projection & Time to Target
Planning estimate using current/target SoC, usable energy capacity, one-way efficiency, and MW. Use the live-unit buttons to load the latest recorded SoC and active setpoint.
Plant Availability / Derating
Append-only status history for SP1 and SP2. Log Available, Derated, or Unavailable states with rated/available MW and reason. A later Available record closes the previous limitation operationally without deleting history.
Equipment Availability
Select multiple PCS/ESS units and log a shared availability status in one action. SP1 uses 1–12; SP2 uses 13–24. Rollups use Site Settings.
Analytics
Longer-term operational insight from active logs and availability records. Deleted and superseded records are excluded automatically.
Mode Utilization
Exclusive tracked time by operating state.Availability / Derating
Time-weighted available MW versus rated MW.MW / SoC Timeline
Logged operation setpoint and SoC measurements across the selected period.Operational Timeline
Chronological state and setpoint changes for SP1 / SP2. Select an event to open the Operations Log.Site Settings
One source of truth for SP ratings, usable energy, SoC limits, efficiency, interval duration, shift schedule, and on-duty PCE.
SP1 • PCS/ESS 1–12
SP2 • PCS/ESS 13–24
AM Shift
PM Shift
GY Shift
Daily / Shift Statistics
Calculated from active operation logs. Charging and discharging energy account for setpoint changes within the selected period.
Operation details
Enter the field data. The message updates automatically as you type.
Shift Notes
Informal notes for this browser. Separate from the formal Operations Log and not included in exports.